FAQs

Who is BOSS Cubez?

BOSS Homes introduces BOSS Cubez as an accessible, adaptable and rapidly scalable solution to dignified transitional housing. Blending the power of manufacturing and the best of onsite construction, BOSS Cubez are highly efficient Built On-Site Systems. Each Cube is made of high-quality durable steel with superior Pcore insulation delivering comfortable and dignified living for those experiencing homelessness.

What are BOSS Cubez made out of?

BOSS Cubez are assembled with panels that are securely linked together creating a home within days. Our panels are made of durable steel and Pcore for a truly dignified home.

What are Built-on-Site Systems (BOSS)?

Built-On-Site Systems are an innovative techonolgy that combines the best of conventional and prefab construction. Our panels are built in the factory and easily snapped into place on site. Efficiency, customization and quality at an accesible price.

Do you provide assembly instructions?

Yes, all our products come with intuitive assembly instructions that guide those with basic assembly skills.

How quickly can you ship?

Full projects ship within 10-12 weeks (shipping times vary by size of project).

Certified

International Residential Codes (IRC 2022)

Emergency Housing Appendix O California Building Codes (CBC 2019)

Building Structural Codes

ADA Accesible

  • BOSS Cubez: A Dignified Solution for the Homeless

    Read Here 
  • Swinerton Prefabricates and Volunteers for 33 Gough Street Supportive Housing Project

    Read Here 
  • San Francisco debuted its first 70-unit prefab tiny home village to help solve the city's homelessness crisis— see inside the structures

    Read Here 
  • DignityMoves Temporary Housing Community Welcomes Residents in Downtown Santa Barbara

    Read Here 
  • Dignity Moves Opens 32 “Tiny Homes” in Santa Barbara

    Read Here 
  • View All

    Read Here 

Our Partners

We thank all of our partners for their continued support and relationships!

Build a Community Today!